I have finally gathered up the motivation to continue the SCF Turing Battlecruiser project! While the entirety of logic and interior work is going to stay, I have scrapped the entire outer hull design and began reworking it. This was a necessary step to get a clear vision for this project again.
I will gradually show teasers of the restructuring process. Today, I shall start with this - part of the back section of the cruiser. It is not yet in detailing phase. The existing CbE-800 long range turret model has been attached to the first (of several planned) medium hardpoints, while the new point defense turret is featured in an array of five below.
The hull rework will have a substantially more angular, industrial design than the original concept. This is intended; below you can see the current state of the hull around the hangar door you already know.
I will gradually show teasers of the restructuring process. Today, I shall start with this - part of the back section of the cruiser. It is not yet in detailing phase. The existing CbE-800 long range turret model has been attached to the first (of several planned) medium hardpoints, while the new point defense turret is featured in an array of five below.
The hull rework will have a substantially more angular, industrial design than the original concept. This is intended; below you can see the current state of the hull around the hangar door you already know.
Last edited: