Found the armor plates for the bridge roof, it no longer leaks.
Lift plates for elevator were on back order, they have arrived.
Due to a mishap with logistics, the shuttle sent from the factory wasn't outfited with the wireless system to control it's hangar launch mechanism. This has been installed.
Do to time constraints, our architects tried to speed up production by leaving off turrets, and in some cases, the turret mounts themselves. Those idiots have been fired. Out of the air lock. The original amount of turrets have been added in as per the original blueprints.