- Joined
- May 27, 2014
- Messages
- 138
- Reaction score
- 152
Stick two things onto the BP window:
1. Estimated total cost of blocks (using base prices from the config)
2. Estimated cost of remaining blocks (using base prices from the config)
1. Estimated total cost of blocks (using base prices from the config)
2. Estimated cost of remaining blocks (using base prices from the config)